Town Chairman Reviews Ongoing Development Works in North Nazimabad.
Timely Distribution of Dues Cheques to Legal Heirs of Retired and Deceased Employees
Modern roads shaping a better future for Block A
Block A shines with a newly constructed modern roadway
12-inch pipeline installation underway in North Karachi, UC-11
North Nazimabad Town Chairman Mr.Atif Ali Khan attended FM-88 Podcast.
Lane Marking Completed at UC-08, North Nazimabad, Block A.
Road Levelling & dressing work at UC-2 Khadija market Block-I.
Sewerage Line Installed in UC-1 Sector 11C
Go Green campaign at North Nazimabad
Sewerage Line Installed in North Karachi, Sector 11-C.🚧🛠️
Road leveling is being carried out in Sector 11-C-2, UC-1 Sir Syed, using the town’s tractor blade
Road leveling is being carried out in Sector 11-C-2, UC-1 Sir Syed, using the town’s tractor blade.
12-Inch Pipeline Installation in Progress in North Karachi, UC-11
Cleaning Work Underway Around B-Amma Park Ahead of Madani Mosque Program
Plantation Drive Launched in Block A Green Belt in Collaboration with Local NGO
Street lights installation work has been carried out in various areas of North Nazimabad.
Street lights installation work has been carried out in various areas of North Nazimabad.
12-Inch Pipeline Installation Underway in North Karachi, UC-11.
In connection with the Madani Mosque program, cleaning work is being carried out through labor around B-Amma Park, UC-1 Sir Syed.
North Nazimabad Town Chairman Mr. Atif Ali Khan attended FM 88 podcast today.
Signing ceremony of S-BOSS (One Stop Shop) Ease of Doing Business Portal with ACS Local Government Mr. Rafique Qureshi, core committee members, and PD Investment Department, Sindh.
The renovation of the main road in Block A has entered its final stages
Restoration of Ziauddin Service road
Debris is being removed in Block I
Atif Ali Khan Inspects Jamia Masjid Block A Development Works
North Nazimabad Town Chairman, Mr. Atif Ali Khan, is inspecting the ongoing road construction work in Block N late at night
Installation of #manholes at main Hilton Street, North Nazimabad.
Asphalting process on the main road of UC-8 is nearing completion
Street lights have been installed on the main road of UC-8, Block A
Road reconstruction in Block A, North Nazimabad.
The construction of the main road in Block A is in its final stages
The installation of lights in North Nazimabad Town is underway.
Construction work on the Block L stormwater drain in North Nazimabad Town is ongoing
Road Construction Progress in North Nazimabad
Light repair work is being carried out in UC-4 North Nazimabad
Storm drain water is accumulating on the dividing road between Block L and Block M in TMC North Nazimabad UC-6
North Nazimabad Resolves Long-Standing Sewage Issue at Block-E
Town loading work at Shafi park 27-11-2025
SWEEPING WORK AT BLOCK N-COMPREHENSIVE SCHOOL
Town Chairman Leads Inspection of Major Development Works
Rainwater Drainage Channel Under Construction to Provide Relief for Block-L Residents
Debris removal work carried out at UC-3
Storm water drain chamber at Ziauddin
Debris removal and Road levelling work carried out at UC 3.
Masjid-e-Siddiq e Akbar's front cleared by TMC staff.
Road Carpeting at UC-08 Block A, North Nazimabad.
Road Levelling & dressing work at UC-02 Block K Deg. College.
Road Carpeting at UC-08 Block A, North Nazimabad.
Engineers have conducted core testing to check the road’s compaction and depth
Restoration of North Nazimabad
A warm reception was hosted by Welfare Union Committee Block E in honor of Chairman North Nazimabad, Mr. Atif Ali Khan
Water Bypass Line Inaugurated in North Nazimabad to Solve Buffer Zone Shortage 💧🚰
Rainwater Drain Construction in Block L, North Nazimabad — Relief for Residents in Progress 💧🏗️
Cleaning operations are underway at Degree College Block 🚮✨
Rapid progress underway on the canal between Block L and N in North Nazimabad 🚧💧
Connection of 8-inch water line in Block K at Mumtaz Hospital Lane
Road levelling & dressing work at Bufferzone Sector 15A-5
Florence Park Snorkel Lift Restored by North Nazimabad Town Chairman 💪🏽🌳 – Turning Challenges into Action
A warm reception was hosted by Welfare Union Committee Block E in honor of Chairman North Nazimabad, Mr. Atif Ali Khan
Rainwater drainage work is underway on the road between Block L and M in UC-6.🌧️🚧
North Nazimabad Town Chairman, Mr. Atif Ali Khan, attended the Iqbal Day ceremony at Government Degree Girls College as the chief guest.
Rapid work is underway on the Median Canal between Block L and N in North Nazimabad. 🚧💧
Before & After Transformation of Block A, North Nazimabad
Street lights installed at Haidari model market
North Nazimabad Town Chairman, Mr. Atif Ali Khan, attended the Iqbal Day ceremony at Government Degree Girls College as the chief guest.
Hydairi Model Market
اس عشق و جنوں کے قصہ کی تفصیل ابھی تو باقی ہے کچھ اور سفر کرنا ہے ہمیں تکمیل ابھی تو باقی ہے
Debris removing and road levelling work carried out at UC7 Khursheed Park Block-H
Road levelling and dressing work carried out at UC 3, Siddiq-e-Akbar
Church being cleaned at UC 10 BLOCK R
A one-kilometer-long drain between Block L and Block M in North Nazimabad is under rapid construction
Sweeping at Church UC-10 Block R
Paver being installed at Hyderi before Saima Paari Mall
20-Year-Old Drain and Sewage Issue Between Block M and L Resolved Under Chairman Atif Ali Khan’s Leadership
36-Inch Sewerage Line Installation Nearing Completion at Ziauddin Gujjar Nala under Chairman Atif Ali Khan’s Supervision
North Nazimabad Town Chairman, Mr. Atif Ali Khan, visited the Block B sewage disposal site
Chairman North Nazimabad Discusses Sewage Issues and Major Leak Repairs with Water Board Officials
Inauguration of Spray Campaign by Jamaat-e-Islami Karachi Ameer Muneem Zafar Khan
Road levelling, dressing and back filling at UC-07 Block-D
After the rain, UC-2 is working day and night to repair the streetlights.
Block A Main Road Transformation from Old McDonald’s to Jamia Masjid Underway
Despite heavy rains, drainage work on the Block L & M dividing road in N.Nazimabad Town continues day and night without interruption.
Street lights installed at UC-2 Block I
Street lights installed at Madni Biryani, Bufferzone
Water from the roads is being cleared after the rain at Shahrah-e-Noor Jahan
Rainwater is being drained from the roads at UC-05 Sector 15-A
Rainwater is being drained from the roads.
UC-08 Block F
Sweeping at UC-10 Block S
Before the procession, cleaning was carried out in and around Babul Ilm Imambargah.
Beautification Work at KDA Chowrangi Launched by Chairman Atif Ali Khan with Bohra Community
Chairman Atif Ali Khan Convenes Emergency Meeting Ahead of Upcoming Rain Spell
Chairman Atif Ali Khan Present with Team at Nagan Chowrangi to Tackle Potential Risks
Road Makeover in Progress!🚜🚧💨#haidarimarket #modelmarket #transformation #Development #ShopSmart #cityupgrade #NorthNazimabad🚀🏗️🛍️✨
Chairman TMC North Nazimabad Town, Atif Ali Khan, Visits Abbasi Shaheed Hospital along with his team
Road levelling & dressing at Block D – near Rose beauty parlor.
Road leveling, dressing, and backfilling at UC-02
Road leveling, dressing, and backfilling at UC-03
Road leveling, dressing, and backfilling at #UC10, Block T, near Rangers Headquarters Street — 01-09-2025.
Road leveling, dressing, and backfilling at #UC2, Sector 14-B, from Haider Foods, Anda Morr to Qalandariya — 01-09-2025.
B&R Department has issued a #LegalNotice concerning unauthorized road cutting for a sewerage connection at Block H, Street 6, #uc7
Road levelling, dressing and back filling at #UC3,Sector 11-E1 Siddiq-e-Akber to Fatima Jinnah colony.1-9-2025
Road levelling & dressing work at UC-1
New #ledlights have been installed at #ShadmanTown, Sector 14-B, in response to public complaints.
Soil piles are being cleared.
Sweeping Wave in action!
Opposition Leader Saifuddin Advocate and Town Chairmen met the MD of Karachi Water & Sewerage Corporation to address issues of line breakages, leakages, and unfair water distribution.
North Nazimabad Town has extended the deadline for availing the property tax concession.
Construction of a one-kilometer-long stormwater drain from Mateen Foods to Karachi Dental College has begun
Road levelling & dressing work at UC-2
Chairman visited Gujjar Nala along with DC Taha Saleem
Chairman North Nazimabad Atif Ali Khan visited New Karachi Gujjar Nala along with Deputy Commissioner Taha Saleem.
Double road levelling and dressing work carried out at Masjid Faizan Siddiq e Akbar Sector 7C
Road levelling, dressing and back filling at UC 6 block N
Pothole Filling Completed at Jan Plaza Chowk, UC-10
Quick Action to Fix Road After Pipeline Damage
Town Administration Fixes Pothole After Sewerage Pipeline Damage
Sanitation department of TMC North Nazimabad town cleaning and draining rain water at UC7, Hyderi
Naala being cleared at UC 7 Bloc G/H Hyderi.
Rain water being removed from streets At UC6 Munawwara ground block L, TMC North Nazimabad
Cleaning and draining rain water at UC7, Hyderi
Performance Report of North Nazimabad Town
North Nazimabad Town has extended the deadline for availing the property tax concession
Sweeping from Izan mart to Masjid Babul Islam along with inside streets(UC 5 sec 15/A-1 )
Token of Appreciation from Fr.Dilawar Samuel, Parish Priest of St. Jude's Church.
North Nazimabad Town has extended the deadline for availing the property tax concession.
Tree Plantation Campaign-2025
Concrete has been poured, painted, and manhole covers installed on all newly built chambers near Iqra University and Seven C Corner. 👷♂️🧱🎨✅
Road Carpeting Begins in Hyderi After Sewerage Work!
Planting trees is not charity — it’s survival. #TreePlantationCampaign
#GOGreenwithtmcNorthNazimabad
Road levelling and dressing work carried out at UC 4, Bufferzone Sector 15B
BEFORE & AFTER! A refreshing transformation at Khurshid Park, Block H, North Nazimabad! 🌿✨
Cleaning completed at Eidgah Ground & Masjid Bab-ul-Islam. 🧹🕌🌿
Cleaning work carried out at Siraj-ud-Daulah School. 🧹🏫✨
levelling and dressing work between block J and K🚧🛠️
Town levelling and dressing work at UC-9 Block P-Abdullah college to Pahad Ganj
Avail a special 5% discount on property tax for the fiscal year 2025–26 by making the payment by July 31, 2025. Office Address: ST-2, Block D, near Tayyaba Mosque, North Nazimabad.
Kachra kundi is being cleaned-UC6 #kachrakundi #cleaningservice 🧹#garbagepoint 🗑️ #tmcinaction 🏙️ #SanitationDrive 🚛 #publicservice 🤝#karachicleanup 🧼#wastemanagement ♻️
A great initiative by North Nazimabad Town #freebooks distribution #communitywelfare #positivechange
Chairman TMC North Nazimabad Town, Mr. Atif Ali Khan, Visits Various Imam Bargahs with Deputy Commissioner Central, Mr. Taha Saleem 🤝
Road Leveling Work Underway on the Instructions of Chairman North Nazimabad Town Atif Ali Khan 🏗️#RoadLeveling 🛣️ #TMCNorthNazimabad 🏙️ #InfrastructureWork 🚧 #BetterRoads 🛠️
Preparations Underway for Majlis Program at Imambargah Fatima – UC-10, North Nazimabad Town.#ImambargahFatima 🕋 #MajlisPreparations 🕯️ #Muharram2025 🖤 #TMCNorthNazimabad 🏙️
Road levelling and dressing work at #UC10 Block S near Bilal masjid ,North Nazimabad.
Sweeping and cleanliness action in #UC1-Sir Syed Sec7D3 #tmcinaction #sweepingwave #DirtFreeZone #NorthNazimabad
TMC north nazimabad town levelling and dressing work UC 1, 7D1 back side of Siddiq e Akber masjid Tikon park 26-5-2025
Our mission continues! 🛠️🧱 From chaos to clean — say goodbye to wall defacement. 🚫🖊️ #WallChalking #FREE #CleanAndBright #TMCInitiative #northnazimabadtown #sakhihassan #peopleschowrangi
Street lights installed at #UC2-Block I & J #LEDUpgrade 💡 #BrightStreets ✨#tmcnorthnazimabad🏙️
Say NO to defacing public property! 🚫🖊️---Old chalking gone. No more dull walls — Fresh coat, fresh vibe!🎨✨ #CleanAndPaint #revivingspaces #PaintForChange #wallchalkingban #FlyoverUpdate #NorthNazimabad
TMC North Nazimabad town UC2, removal of illegal water connection taken by Al Mateen Foods.
TMC North Nazimabad town levelling and dressing work UC 7 block H khursheed begum park 22-5-2025
TMC North Nazimabad: Sewerage Line Work Underway on the Dividing Road of UC 7 Block D & C near Ashraf Masjid 💧🚧
Block A, North Nazimabad – Nala side being cleaned. 🧹🚧 #CleanUpInProgress #NorthNazimabad #SanitationDrive 🧼🌊🏙️
Road Works Underway in UC6-Block N🚧 Levelling and dressing progressing rapidly to ensure smoother commutes. #UC6 #updates2025 #roaddevelopment #tmcnorthnazimabad #karachiprogress
TMC North Nazimabad UC 7 Block "H" Haidari market
#tmcnorthnazimabad has cut the SSGC-installed gas line.Residents are advised to remain cautious during the process. #InfrastructureUpdates #tmcnorthnazimabad #SSGC #ActionTaken #KarachiDevelopment ⚠️🔧🏗️
An illegal sewerage line was installed in #UC7 Block D 🚫💧, prompting the department to issue a notice 📄⚠️. Swift action has been taken by the B&R Department 🛠️✅. #illegalsewerage #ActionTaken #UC7 #MunicipalMatters #cleancity
Levelling and dressing of roads in UC1-7C is in full swing. 🚧🛠️ #roadimprovements #tmcupdates #NorthNazimabad #UC1 #babulislam #karachiprogress #DevelopmentWork 🛣️🚜
Laying of Sewerage line in block -C near Ashraf masjid uc-7 TMC North Nazimabad
Illegal water connection detected!🚱 TMC North Nazimabad UC-1-7D/3 & 7D/2 dividing road found with an unauthorized water connection. Immediate action has been taken.
Say No To Visual Pollution🚫🖊️Walls ≠ Billboards Let’s stop writing on walls-there are better ways to spread a message. Diwaron ko tu bakhsh dain🙏
Walk safely. Drive confidently🚶♀️💡 New street lights are up in #UC2! #streetlightupdate #SafeNights #publicsafety #shadman #NorthNazimabad
Work in full swing at UC 3!🚜🚧🏗️ #RoadWorkUpdate #levelledup #betterroadsbetterlife #abdulhameedshah
Yet another day-the same message: say no to visual pollution🚫🖊️ Let’s protect our public spaces from unnecessary mess
Road levelling and dressing in action! #UC7 #roadtransformation #levellinginprogress #roadgoals #fixitright #hairdry #NorthNazimabad
Heavy machines, hard work, and high hopes — the #UC1 road revamp in progress!
Another day, street lights up at #UC3! 🌃🔧 #streetlightmission #dailyprogress #NorthNazimabad
New Sewerage Disposal System installed at Gulshan-e- Waseem, Bufferzone A-16
No more waterlogging! Drain cleaning happening now in UC6-Block L & M. 🚧🧹
UC9 Pahar Gunj chowrangy is getting a clean sweep! #cleanwave #teameffort #pahargunj #northnazimabad
Saifuddin Advocate and Town Chairmen File Petition for Empowering Local Governments
JI Leaders Meet SSWMB MD, Voice Strong Concerns Over Poor Sanitation and Lack of Cooperation
Dr. Feroze Road Inaugurated in Buffer Zone by Ameer Jamaat-e-Islami Karachi
Youm-e-Azam Conducted at Hasrat Mohani English Medium Primary school,North Nazimabad.
تھر کو تراشا، مٹی سنواری، خوابوں کی تعبیر ہم نے سنواری۔ ہر راستہ امید سے جگمگایا، ترقی کا کارواں آگے بڑھایا۔ پرانے نشان مٹائے ہیں ہم نے، نئے سفر کے چراغ جلائے ہیں ہم نے۔ حوصلوں نے لکھی نئی پہچان، کل سے آگے، نئی ہے اُڑان!** 🛣️✨
Road levelling and dressing work at #UC6 Block L and N
Immediate action against illegal road cutting.
Road levelling and dressing work at #UC6 Project 🚧 #BetterRoadsAhead🚗 #DressingTheRoad🌍 #RoadWorkInProgress 🏗️
A #SilentMessage from #northnazimabadtown – Respect the graveyard, maintain cleanliness, and remember that we all share the same fate. It is our moral responsibility!
Cleaning of drains and removing debris is being carried out!🧹🚮💧 #draincleaning #wasteremoval #cleancity #NorthNazimabad
North Nazimabad Introduces First Ever Fiber Manhole Covers!
Road Makeover in Progress! 🚜🚧💨 #LevelUp #roadreva #NorthNazimabad